Case Studies

Rectangular Clarifier Tank Rebuild

Problem: The municipality was using old cast steel sprockets and wall hanger bearings were seizing due to corrosion. Solution: Engineered, Manufactured, and supplied a total tank rebuild comprised of; composite sprockets, wall hanger bearings, chain, and flights.  With the use of our engineered plastic, the moving parts in the rectangular clarifier will not corrode and prematurely fail!

Rectangular Clarifier Tank Rebuild Read More »

Injection Molded Hose Clamps

Problem: The OEM was purchasing a machined hose clamp that due to the sheer volume of clamps, was costing them a LOT of money. This expensive product was not adding value to the performance of their equipment. Solution: We built an aluminum mold base for injection molding to meet the customer’s volume requirements. This cost-saving solution saved

Injection Molded Hose Clamps Read More »

“Lamborghini” Green Scale Quality Idlers

Problem: The customer’s old scale frames were not reinforced and built to last in their harsh mining application. Since scale quality idlers must be built to a much tighter TIR than traditional idler rollers they are generally more expensive and thus it’s critical they be installed in the appropriate area within the conveyor system. Solution: Engineered and

“Lamborghini” Green Scale Quality Idlers Read More »

Scroll to Top