Case Studies, Conveying, Food Processing

COST SAVINGS for Plastic Modular Belting

Problem: Customer was spending too much money on Intralox Belting.

Solution: We provided a belt that costs 20% less upfront. This was a direct drop-in belt for the customer’s existing belt, eliminating the need for a sprocket change out. These upfront cost savings allowed them to utilize their resources in other ways.

These pictures shown are taken AFTER the belt had run for AN ENTIRE YEAR!

Scroll to Top

Enter Your Information to View