COST SAVINGS for Plastic Modular Belting
Problem: Customer was spending too much money on Intralox Belting.
Solution: We provided a belt that costs 20% less up front. This was a direct drop in belt for the customers existing belt, eliminating the need for sprocket change out. This upfront cost savings allowed them to utilize their resources in other ways.
These pictures shown are taken AFTER the belt had run for AN ENTIRE YEAR!